Stuttgart-Ulm railway project

When it came to the planning and construction of Bossler Tunnel and Steinbühl Tunnel located on the new DB railway line between Wendlingen and Ulm, ÖSTU-STETTIN headed up the commercial management operations. At peak times, the construction site was filled with approx. 350 employees from the ‘Albaufstieg Tunnel Consortium’.
Value Chain Management