Rinterzelt / RinterNEU MA 48

For a long time, the tent-like MA 48 waste treatment plant in Vienna's Donaustadt was a notable construction. The 68-metre-high building was spectacularly demolished in autumn 2019, and HABAU was commissioned with its destruction. The three-phase project also includes the construction of numerous new state-of-the-art on-site company buildings. The contract volume is approx. 46 million euros.
Rinterzelt / RinterNEU MA 48 © Robert Oberbichler
Rinterzelt / RinterNEU MA 48 © Robert Oberbichler
Investment volume: 46 Mio. €
Total area: 56.000 m²
Construction time: 41 Monate